EXERCISE 5 – Assembly Operation
Update the previous simulation model with an assembly operation. Optimize the arrival
parameters.
Element
Run time [h]
Setup time [h]
Modelling Instructions:
Create two additional Locations: IN Pallet Assembly and Assembly Station
Add the Entities: Bearing A, Bearing B and Shaft C
Update the Path Networks (max. 2 m between locations)
Keep the same Resources
Processing
a. Process – Assemble (use the logic order:
JOIN
Number of Elements Entity
Name)
i. Two elements of Bearing A with Shaft 1 [USE
resource name
FOR
(2 x
Run time Bearing A)]
ii. Bearing B and Shaft C with the Gear [USE
resource name
FOR
(Run
time Bearing B + Run time Shaft C)]
b. Routing – Transport
Rule
for Bearing A, Bearing B and Shaft C:
IF JOIN
REQUEST
(at the IN Pallet Assembly)
6. Arrivals –Adjust the quantity, First Time and Frequency of the Elements to be joined
at the IN Pallet Assembly
1.
2.
3.
4.
5.
Bearing A
0.10
0.20
Bearing B
0.10
0.20
Shaft C
0.15
0.25
Plik z chomika:
baloniasz171
Inne pliki z tego folderu:
Class Document-extended introduction.pdf
(1400 KB)
Ex_10.pdf
(196 KB)
Ex_6.pdf
(58 KB)
Ex_2.pdf
(81 KB)
Ex_11.pdf
(73 KB)
Inne foldery tego chomika:
Zgłoś jeśli
naruszono regulamin